WILLOW CREEK HYDRO OR HOW DENMARK, OREGON "LIT UP" BANDON and LANGLOIS

By Jerrry and Bonnie Cox

Willow Creek Hydro

PDF icon WILLOW CREEK HYDRO PDF

Langlois (that gateway to Denmark, Oregon) once relied on the little hamlet for its electric power. Denmark was settled during the late 1800's and early 1900's, primarily by farmers and ranchers with Scandinavian heritage. It was once a bustling community of several hundred people and had a cheese factory, post office, a general store, dance hall, and school. A person could take music lessons from Jennie Malehorn, employ J. H. Upton for notary and collection services, and have fresh meat delivered by Joseph Hare. The townlet even had its own newspaper, the Southwest Oregon Recorder. With Willow Creek being the area’s primary geographical feature, dozens of homesteads were established in the surrounding area.

In the early 1900s the nation was gradually becoming “electrified”.  Locally, Marshfield and North Bend were the first to utilize the new source of power on a wide-scale; Coquille and Myrtle Point soon followed.  At the time, the most common way to produce electricity was to use a generator driven by a spinning turbine. However, in order to make the turbine turn, another source of power was needed.  Steam was the power source of the day and the fuel for producing it was either coal or wood.  As shown in the diagram below, coal or wood heated the water, creating steam.  The steam then turned the blades on a rotor shaft that in turn spun the generator, thereby converting kinetic energy into electrical energy.  Although that method was successful, it did require a continuous source of coal or wood and was labor intensive. .

 

Diagram: Electrical 4U Generating electricity with steam

A more efficient process was to turn a turbine by using the force of water. Bandon had its own steam-generated electric plant in 1907, but it was in need of a method that would produce more horsepower to meet the needs of the city's growing population and industrial expansion. In the early 1920's, Bandon’s city council decided to explore the possibility of converting to hydroelectric power, but for that they needed to find an appropriate water source. A firm was hired to do a feasibility study to determine if such an idea was viable and practical. One by one, rivers and streams in the area were examined and then dismissed because there was either not sufficient water flow or there was not enough drop in elevation to create the force needed to drive a turbine. Four Mile Creek, Floras Creek, Crystal Creek, Sixes River, and Elk River all came up short. But one water source seemed ideal, and that was Willow Creek at Denmark, Oregon.

Plans were developed. Engineers calculated that establishing a hydroelectric facility on Willow Creek would necessitate constructing a 120-foot-long diversion dam of logs, rock, and earth, sixty feet high and sixty feet thick at the base. A portion of Willow Creek would need to be diverted into a reservoir that would hold forty acre-feet of water (Bandon Western World, February 24, 1921, p. 1).  One acre-foot contains 336,000 gallons of water. A forty-acre-foot reservoir would equate to forty feet of water covering an area of one acre. One acre is about the size of 1.3 football fields. The dam would have to be located more than a mile upstream from a proposed powerhouse to ensure there would be the necessary water velocity to generate electricity. A powerhouse and other buildings would have to be built close to the Roosevelt Highway (later HWY 101). Large cedar stave conduits, reinforced with metal Allen shoe retaining bands and coated with tar needed to be installed to transport the water from the reservoir part of the way to the power station. The wooden conduits would then gradually be reduced in diameter with iron pipes to increase the force of the water. Ditches, tunnels, timber trestles, and cable slings were needed in some areas to allow proper footing for the heavy arterials.

 

Diagram: Low Tech Magazine Cedar stave conduit water pipe
Diagram: Low Tech Magazine Cedar stave conduit water pipe

 

Inside the powerhouse there would be a large steel turbine known as a “Pelton wheel” attached to a shaft connected to a generator (diagram below.) The torrent of Willow Creek water entering the powerhouse via the inflow pipe would be directed toward the buckets on the Pelton wheel, causing it to turn rapidly. As it turned, it transferred its energy to spin a generator that in turn would create an electric current. There was also a Plan B should water levels drop: Divert Crystal Creek north of Sixes into Willow Creek, a notion that was extremely impractical due to elevation discrepancies.

Diagram: Power Generation Technologies (Second Edition) 2014 Generating hydroelectricity
Diagram: Power Generation Technologies (Second Edition) 2014 Generating hydroelectricity

A work camp had to be established on the John Chenoweth homestead for the 40-50 workers that would be needed to complete the project. Tents for a field mess hall, sleeping quarters, and even a “Men’s Area” were all part of the plan to facilitate the work effort as the construction crew would have to stay on the premises to maximize efficiency.

Engineers estimated that a maximum of 400 horsepower could be created using the planned method. The existing Bandon power plant was capable of producing a maximum of only forty horsepower (Ibid).  Transmission lines from Denmark to Bandon would need be erected and rights-of- way secured.

All of this would come at a cost: (Beckham, Dow, Bandon-By-the-Sea, 1986. Pgs. 92-93)

Construction of dam $25,283
Pipeline $26,874
Powerhouse & Machinery $ 7,479
Transmission Lines and rights-of way $25,538

In March, 1921, the City of Bandon floated a $110,000 bond ($2 million in 2024 dollars) to cover the Willow Creek hydro project and purchase of equipment from the old Bandon Power Company. The bond measure was overwhelmingly approved by Bandon voters. Hydroelectricity at Willow Creek would become a reality (Coos Bay Times, March 9, 1921, p. 1). The bond was purchased by a company in Portland, Oregon and work on the project commenced almost immediately.

 

Photo: Bandon History Museum Workers installing conduit from reservoir to power house at Willow Creek (Note the cable sling in lower lefthand corner)

Photo: Bandon History Museum Wooden Conduit at Willow Creek (Note the metal retaining bands and support trestle)

In early January, 1921, the Willow Creek Hydroelectric Power Plant was ready for its first test run. There had been cost overruns and the dam proved more difficult to construct than anticipated, but the project was complete. The trial test was limited to slowly releasing the reservoir water so that it could activate the Pelton wheel which in turn put the generator in motion. The goal was simply to light the powerhouse. It worked! There were still obstacles to overcome, but the end was in sight. An earthquake one month later separated some of the wooden pipes, but they were soon repaired. In August, 1922, Bandon began receiving electricity generated by the Willow Creek Hydroelectric Power Plant located at Denmark. By the end of the year, Langlois and points north of Willow Creek also reaped the benefits of the new power source. But ironically, homes and farms south of Willow Creek would not receive electricity until 1932. All power generated by Willow Creek traveled north.
 

Within a few short years there was competition in the electrical power market. Mountain States Power Company offered to install a diesel-fueled generator at Beaver Hill (approximately 12 miles south of Marshfield) and supply electricity to Bandon. Bandon administrators felt they needed a backup to the Willow Creek facility and signed a contract with Mountain States. At the same time, they also invested in newer and more efficient machinery for the Willow Creek plant. To help offset costs, employment at the hydro facility was reduced (Ibid, October 29, 1924, p. 2).  Although only two years old, competition and expense proved to be early harbingers that would determine the longevity of the Willow Creek Hydroelectric Power Plant.

In July, 1924, a different type of "juice" was being generated near the power plant.

 

Still Captured Near Langlois Coos Bay Times, July 16, 1924, p. 1

 

In mid-1924, it became apparent to some that maintaining a hydroelectric plant miles away from where the product was destined may not be the most cost effective way of providing power to Bandon. Mountain States Power Company was eager to provide full service that would allow Bandon to cease operating and maintaining the Willow Creek dam, pipeline, and powerhouse. Mother Nature also played a role in the sentiment as storms and lightning frequently played havoc with the service.

Hydro Offer Turned Down

It came as no huge surprise that in May, 1927, the Bandon City Council recommended that the hydro plant at Willow Creek be sold. It was a contentious issue. The city council even put a price of $120,000 on the sale, but it would require voter approval. The voters convincingly turned down the measure.

A company in Oklahoma and another in Northern California made offers in 1928 and 1929 to buy the hydro plan, but their offers fell on deaf ears. In fact, in 1932, Bandon updated the Western World, August 18, 1927 Willow Creek facility and installed a new circuit panel and gauges, expanded the capacity of some transmission lines, and made plans to extend power south as far as Port Orford (Ibid, May 11, 1932, p. 5).

On September 26, 1936, much of Bandon was decimated by fire. Transmission lines from Willow Creek to Bandon were destroyed in some areas, but the power plant itself was not damaged. Much of the economy of Bandon was ruined, homes demolished, and people displaced. The following year, Port Orford established its own diesel power plant, thus relying less on the electricity provided from Willow Creek. Both events challenged the continued existence of the dam and powerhouse at Denmark.

In 1935, President Roosevelt created the Rural Electric Administration (REA) to provide electricity to rural area. Soon electrical cooperatives (co-ops) sprung up around the state.

In 1938, the Bonneville Dam on the Columbia River was finished and it would play a major role in determining how electricity was to be distributed in the Pacific Northwest. Bandon soon began to investigate the advantages of securing electricity from the Bonneville Power Administration (BPA). Cities throughout Oregon were signing contracts with the BPA, for not only was the new source of power reliable and relatively inexpensive, it relieved local governments of having to operate and maintain their own power plants.

The Coos Electric Co-op was established in 1940 and extended lines into Curry County serving areas that were not supplied with power from Willow Creek. Coos Electric Co-op bought the Port Orford power plant and the continuation of the Willow Creek Hydroelectric Power Plant was again threatened. And then came war.

During 1941-1945, attention and resources were directed toward the war effort. It was a time of resurgence for the power emanating from Willow Creek as the farms in the Floras Lake area were deemed essential for producing food, yet they had not yet been electrified. The Office of War directed that power be furnished and farms owned by Charles and Allie Farrier, Art Strain, Chas. Fox, and Frank Kenworthy were soon "on-line." Interestingly, the Floras Lake Hotel was not included in the program even though it was serving as home base for the U.S. Coast Guard and its Shore Patrol. The War Department reasoned that since the facility already had a Kohler diesel generator it did not need to be connected to the grid (Western World, December 2, 1940, p. 1).

 

Hydro - Electric Extends Farm Line in Northern County

For the duration of WWII, there was somewhat of a status-quo mindset regarding the Willow Creek Hydroelectric Power Plant.

In January, 1945, Coos Electric Co-op announced that after the war was concluded it would serve both Coos and Curry Counties. It was an ominous proclamation for the Denmark power source. In February, 1946, Coos Electric Co-op offered to purchase the Willow Creek Hydroelectric Power Plant and all transmission lines for $65,000. The City of Bandon countered with $75,000 and the adjusted price was agreed upon. But voters still had to approve the sale. In May, 1941, by an eleven-vote margin, the voters of Bandon rejected the transaction. Soon after, Coos Electric Co-op was renamed Coos-Curry Electric Co-op.

 

Vote Not To Sell Hydro Plant, Line

In November, 1946, Bandon City Utility Manager A. E. Pitts stated, "A larger budget and securing unavailable materials are two items most desperately needed to relieve our capacity loaded hydro-electric system." (Ibid, November 14, 1946, p. 1). Three months later it was announced that the BPA had entered into a contract with Mountain States Power Company which in turn would sell power to Bandon in the future. It was a death knell for the Willow Creek Hydroelectric Power Plant, but it continued to operate for a few more years.

An engineering firm was retained by the City of Bandon to do a feasibility study regarding the dam and powerhouse in 1949. The recommendation was that the city should abandon the Willow Creek power plant as soon as BPA power was made directly available because the facility simply could not produce power as cheaply as the BPA (Ibid, May 19, 1949, p. 1). The Denmark turbine continued to spin for another year or so under the supervision of Alta Roberts (1950 Census for Langlois, Oregon), but in January, 1951, the Bonneville Power Administration negotiated control of the electrical supply of power for Bandon and Langlois, and the generator on Willow Creek came to a final halt.

 

Bandon Calls for bids on Willow Creek Power Plant

There were three bids for the property and Edwin “Bud” Bement's was the highest at $3,600 (Ibid, April 10, 1952, p. 1). Bement already owned property adjacent to the land being sold.

The dam soon fell in disrepair and its reservoir slowly receded back into the flow of Willow Creek. Pipes and machinery were salvaged. The powerhouse and other buildings became hostages to the elements. With windows broken, doors removed from their hinges, and leaks in the roof, the powerhouse became home to critters and varmints of all types. In the late 1990's or early 2000's metal roofing was placed on the structures and some of the original plant still stands today, vestiges of a time when securing vital electric power was in its infant stages and people would go to great lengths to obtain it.

In the years that followed, the only evidence of the once expansive power system were a few abandoned buildings and a residual pond that became a fishing hole for nearby children.

 

Young Wilbur Jensen fishes the abandoned reservoir pond on Willow Creek.
Young Wilbur Jensen fishes the abandoned reservoir pond on Willow Creek.

Photo: Cox Collection Looking east, up the Willow Creek draw
Photo: Cox Collection Looking east, up the Willow Creek draw

The powerhouse was located to the far lower left, out of photo range, and the dam was constructed beyond the first prominent hill in center background

 

The Willow Creek powerhouse. Water discharged from the turbine, exited through the concrete shoot on the left, and was returned to Willow Creek.
Photo: Cox Collection

The Willow Creek powerhouse. Water discharged from the turbine exited through the concrete shoot on the left, and was returned to Willow Creek.

 

Photo: Cox Collection Circuit box inside the powerhouse
Photo: Cox Collection Circuit box inside the powerhouse
Photo: Cox Collection Powerhouse outbuilding #1
Photo: Cox Collection Powerhouse outbuilding #1
Photo: Cox Collection Powerhouse outbuilding #2
Photo: Cox Collection Powerhouse outbuilding #2

 

 

The images above show the location of the powerhouse and its proximity to Denmark, Oregon

In 1981, an attempt was made by Ellis Foster to rebuild the dam and create electrical power that could be sold to the BPA. He envisioned a 95-foot-high dam, a mile of 30-inch pipeline, and a reservoir of up to 900 acre-feet. The cost was estimated between $3 million and $6 million (The World, February 13, 1981, p. 12).  Permits, cost, and other circumstances kept the project from ever being fulfilled.

Read more about WILLOW CREEK HYDRO OR HOW DENMARK, OREGON "LIT UP" BANDON and LANGLOIS

Locals hit with Gift Card Scam: Here's how to avoid

Only scammers will tell you to buy a gift card, like a Google Play or Apple Card, and give them the numbers off the back of the card. No matter what they say, that’s a scam. No real business or government agency will ever tell you to buy a gift card to pay them. Always keep a copy of your gift card and store receipt. Use them to report gift card scams to the gift card company and ask for your money back.

How Gift Card Scams Work


Gift card scams start with a call, text, email, or social media message. Scammers will say almost anything to get you to buy gift cards — like Google Play, Apple, or Amazon cards — and hand over the card number and PIN codes. Here are some common tactics scammers use in gift card scams:

  • Scammers will say it’s urgent. They will say to pay them right away or something terrible will happen. They don’t want you to have time to think about what they’re saying or talk to someone you trust. Slow down. Don’t pay. It’s a scam.
  • Scammers will tell you which gift card to buy (and where). They might say to put money on an eBay, Google Play, Target, or Apple gift card. They might send you to a specific store — often Walmart, Target, CVS, or Walgreens. Sometimes they’ll tell you to buy cards at several stores, so cashiers won’t get suspicious. The scammer also might stay on the phone with you while you go to the store and load money onto the card. If this happens to you, hang up. It’s a scam.
  • Scammers will ask you for the gift card number and PIN. The card number and PIN on the back of the card let the scammer get the money you loaded onto the card — even if you still have the card itself. Slow down. Don’t give them those numbers or send them a photo of the card. It’s a scam.

Read more about it at: https://consumer.ftc.gov/articles/avoiding-and-reporting-gift-card-scams

 

Read more about Locals hit with Gift Card Scam: Here's how to avoid

Langlois Boil Water Advisory Lifted - DRINK AS USUAL!

Best news. We just got the water test back and we are off boil notice. The tank is full of clean water so no more restrictions. We had a company out of Riddle OR come and help us assess the situation which resulted in a new $3,750.00 chemical pump. This along with some other changes to the plant has proven to help our situation and improve things considerably. Please continue to spread the word and let everyone know. Please thank Kevin Gleason and Zach for working hard and putting in some dang hard and long hours.

[UPDATE: LIFFTED DRINK NORMALLY] DRINKING WATER WARNING - BOIL NOTICE LANGLOIS OR 1/22/24

 DRINKING WATER WARNING
LANGLOIS WATER DISTRICT HAS HIGH TURBIDITY LEVELS
BOIL YOUR WATER BEFORE USING

We routinely monitor your water for turbidity (cloudiness). This tells us whether we are effectively filtering the water supply. A water sample taken 1-22-24 showed turbidity levels of variations of 1.0-4.0 turbidity units. This is above the standard of 0.3 turbidity units. Because of these high levels of turbidity, there is an increased chance that the water may contain disease-causing organisms.

What should I do?

DO NOT DRINK THE WATER WITHOUT BOILING IT FIRST. Bring all water to a boil, let it boil for one minute, and let it cool before using, or use bottled water. Boiled or bottled water should be used ·

  • Drinking
  • Brushing teeth
  • Washing fruits and vegetables
  • Preparing food and baby formula
  • Making ice
  • Cleaning food contact surfaces

You can do other normal things like washing clothes and showering. Just before ingesting the water you MUST boil the water.

Turbidity has no health effects. However, turbidity can interfere with disinfection and provide a medium for microbial growth. Turbidity may indicate the presence of disease causing organisms. These organisms include bacteria, viruses, and parasites, which can cause symptoms such as nausea, cramps, diarrhea, and associated headaches. People with severely compromised immune systems, infants, and some elderly may be at increased risk. These people should seek advice about drinking water from their health care providers.

The symptoms above are not caused only by organisms in drinking water. If you experience any of these symptoms and they persist, you may want to seek medical advice.

What happened? What is being done?

What is happening; we believe our flocculation mixer is running too fast to create a floc. A Floc is when chemicals coagulate on solids in the water and cause sedimentation of foreign debris which is then separated from the water. The water in the water tank will floc for a short while then it will stop causing the turbidity to climb back up. We are looking into an electrical variable speed switch to bring the rpm down of the mixer. We also have slowed down the flow to see if that will help create floc. We have brought our chlorine up to help with any disinfection for the higher than normal turbidity. Also we have called the Oregon Association of Water Utilites (OAWU) for assistance. We are unsure of how long this process may take. We will update everyone through email or social media ie. Facebook (World Famous Langlois, Langlois Water District Community) as status changes or once we are off the boil notice.

For more information, please contact Kevin Gleason at 805-889-9836 or 94322 1st st. General guidelines on ways to lessen the risk of infection by microbes are available from the EPA Safe Drinking Water Hotline at 1(800) 426-4791 or the Oregon Department of Human Services Drinking Water Program at (971) 673-0405.

Please share this information with all the other people who drink this water, especially those who may not have received this notice directly (for example, people in apartments, nursing homes, schools, and businesses). You can do this by posting this notice in a public place or distributing copies by hand or mail.

This notice is being sent to you by Langlois Water District. State Water System ID#: 41-00466. Date distributed: Jan 22, 2024


PDF icon boil water notice high turbidity 22 Jan 24.pdf Read more about [UPDATE: LIFFTED DRINK NORMALLY] DRINKING WATER WARNING - BOIL NOTICE LANGLOIS OR 1/22/24

RIP Josiah Selvy class valedictorian Pacific Highschool

 Josiah James Wallace Selvy 18, was ripped from our world on New Years Day 2024. Siah a resident of Port Ordord, Oregon left behind his mother Amanda, sister Serinity, Nick, Bruiser Bear, a plethora of grandparents, aunts, uncles, cousins, extended family and friends.
Josiah graduated Pacific High school in June as class valedictorian. He was a proud Pirate and played post on the high school basketball team. He had a flare for life, loved the outdoors and worked hard. Josiah adored his family and could often be found hanging out with them. He loved with his whole heart and will be greatly missed by all who knew him.

see https://www.legacy.com/us/obituaries/name/josiah-selvy-obituary?id=54023336

and https://www.currypilot.com/news/fatal-crash-on-highway-101-in-curry-coun...

So sorry dang F*** .. nothing else to say to make anything better about this. It's heartbraking.   

 

Read more about RIP Josiah Selvy class valedictorian Pacific Highschool

Pages

Subscribe to RSS - blogs